A102 Style Light Medium Duty Gravity Conveyor Roller
Basic Info
Model NO. | A102 |
Material | Metal or PVC Tube |
Surface Treatment | Zinc Plated/ Stainless Steel |
Installation | Spring Loaded/Milling Flat/Female Thread |
Tube Diameter | 38, 50, 60mm |
Shaft Diameter | 12, 15mm |
Length | Customized |
Applicable Temperature | -5ºC to +40ºC |
Load Capacity | 80kg to 250kg |
Transport Package | Wooden Case or Customized |
Trademark | CCDM |
Origin | Huzhou, Zhejiang, China |
HS Code | 8483190000 |
Production Capacity | Total Manufacturing Capacity: 120, 0000 PCS/Year |
Product Description
GRAVITY STEEL CONVERYOR ROLLER (A102)Product Description
- Precision bearings and polymer housings for quiet running.
- Nice look polymer end caps for dust and waterproof.
- For conveyor speed up to 120 m/min subjected to roller diameters and lengths.
- Anti-static design is available.
- Applicable temperature: -5ºC to +40ºC.
Installation Method:
Spring Loaded Milling Flat Female ThreadMaterial | Tube Diameter & Thickness | ||||
Galvanized Steel | Φ 38*1.2 | Φ 50*1.5 | Φ 50*2.0 | Φ 60*2.0 | Φ 60*3.0 |
Stainless Steel | Φ 38*1.2 | Φ 50*1.5 | Φ 60*2.0 |
Tube Diameter(D) | Shaft Diameter(d) | E | L |
Φ 38 | Φ 12 | E=W+9 | L=W+31 |
Φ 50 | Φ 12/15 | E=W+9 | L=W+31 |
Φ 60 | Φ 12/15 | E=W+9 | L=W+31 |
Φ12(M8*15) Φ15(M10*20) |
Detailed Photos
Company Profile
Packaging & Shipping
Packaging: Normally packed with wooden drums and cartons, other ways can be done according you.Delivery Time:12Days ~ 45Days ( according to the amount)
1) Can we get your free samples?Yes, it is ok. Our Samples are free for the customers. But the freight for express is on buyer's account.2)How long to get the sample?After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3~5 days.3) Can we combine many items size in one container in my first order?Yes, it is ok. But the quantity of each ordered item should reach the MOQ for trail order.4) What is the normal lead time ?A. For inventory products, we will send goods to you within 7-10 work days after we receive the deposit.B. For mass production, the delivery time is 25-28 days after we received the depositC.For OEM products, the delivery time is 30-35 work days after we receive the deposit.5) What is your payment term?T/T 30% advanced before production,70% balance payment before delivery6) What is your shipping way?We will help you to choose the best shipping way according to your detail requirements.By sea, by air, or by express delivery, etc.7)How long to get the sample?After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3~5 days.8)How is your package?Normally packed with wooden drums and cartons, other ways can be done according you.